Wednesday, 16 December 2015

pre- production planning


Pre-Production Planning

We have decided that we can meet Thursday p4 and Monday p4 and onwards (lunch).  Allan is responsible for camera movement. Neve and I are responsible for the location, Neve is responsible for make up and I am  (sophie)responsible for costume and lighting. We will get a camera, tripod and a light from the editing suite. For our film we used a camera, a microphone, a tripod for the the camera to keep it still and to shop the shaking while filming and a light. 

 Risk assesment of our filming

We filmed on the stairs down by the art rooms, at times we were walking and running up and down the stairs. This could be a hazard because we could fall down the stairs and injure ourselves and other people. A second risk to us and the people around us was the lighting, we had was dark light and a spotlight, however during filming there were times when it was very dark. This could be a hazard because we couldn't see properly so someone could trip or damage on our surroundings. Finally, one of our risks could be the opening and closing of the doors in a fast manner, we could hurt people or ourselves by hitting them with the doors
 

No comments:

Post a Comment